Friday, January 30, 2009

Stimulus package: Greater Coherence needed

The effectiveness of the additional stimulus package of around Rs 10 billion, equivalent to 3.8% of GDP ( much above the 2% norm recommended by the international institutions) to shore up our economic performance will depend to a large extent on some important parameters. A fundamental one, as pointed out by erudite Pierre Dinan, is our ability ofsortir du mode du projet pou passer à l’action” - especially the big time lag between allocation of funds and actual work being started.